Search
Close this search box.
Resources

Technical Papers

102. TORSIONAL CONTROL OF TWO ADJACENT OFFICE BUILDINGS USING VISCOUS DAMPERS

Two adjacent wings of a three story office building in Southern California were found by analysis to be excessively responsive in torsion under an earthquake on the near-by Newport-Inglewood fault, some five miles from the site. The generous 4.5" seismic separation between the two office building segments was found to be inadequate to prevent heavy pounding even in a moderate event, having a high probability of occurrence at this location. A variety of structural retrofit schemes were evaluated to mitigate the excessive torsional responses of the two building segments. These included converting the perimeter gravity frames to moment resisting frames, adding diagonal bracing to the perimeter frames, tying the two structures together at each floor level, and using viscous dampers as attachments between the buildings. The best solution from a cost, schedule, construction disruption, and earthquake performance standpoint, turned out to be joining the two building segments with horizontally oriented viscous dampers at a single floor level. This paper describes the analysis and retrofit solution that was used, and discusses the advantages and disadvantages of the retrofit options studied.

Share This Post

More To Explore

White Paper

2. Bridge Design

This paper reports on a non-linear analysis of a bridge supported on sliding bearings with elastomeric restoring spring and viscous dampers. Results were verified with shake table tests.

Read More »
Case Study

10. INVESTIGATION OF LIGHT POLE BASE INTEGRITY – RICH STADIUM

Light poles at Rich Stadium in Orchard Park, N.Y., were showing incipient failure of their hold-down bolts, due to wind excitation. This paper describes the measures used to alleviate this problem, including the addition of viscous dampers between the stadium structure and a point around one third up on the light poles.

Read More »

Investor Information

2022 Q1 Important Links

 

Investor Information

2021 Q4 Important Links

Investor Information

2021 Q3 Important Links

Investor Information

2021 Q2 Important Links

Investor Information

2021 Q1 Important Links

Investor Information

2020 Q4 Important Links

Investor Information

2020 Q3 Important Links

Thank You!

A Taylor Devices Representative will be in touch shortly.

Investor Information

2020 Q1 Important Links

Investor Information

2019 Q4 Important Links