Gerald Desmond Replacement Bridge Featured in Informed Infrastructure

The February edition of Informed Infrastructure magazine features an extensive article on the Gerald Desmond Replacement Bridge. This feature goes into great detail, outlining the project, and provides a great summary of the unique FVD system designed for this project. 

For this and more information on this project, we encourage you to check out the entire article on the Informed Infrastructure website as well as the rest of their February edition. 

Taylor Devices Damper installed in building
Credit: Denis Wolcott of The Port of Long Beach

Fluid Viscous Dampers being installed on the Gerald Desmond Replacement Bridge.

Investor Information

2022 Q1 Important Links

 

Investor Information

2021 Q4 Important Links

Investor Information

2021 Q3 Important Links

Investor Information

2021 Q2 Important Links

Investor Information

2021 Q1 Important Links

Investor Information

2020 Q4 Important Links

Investor Information

2020 Q3 Important Links

Thank You!

A Taylor Devices Representative will be in touch shortly.

Investor Information

2020 Q1 Important Links

Investor Information

2019 Q4 Important Links