Search
Close this search box.

Bayer Berkeley CCTC

Berkeley, CA

ABOUT

Location Berkeley, CA

Size 40,000 sqft

Stories 3

Building Type Healthcare

Number of Dampers 60

Structural Engineer Paradigm

General Contractor Flour

Owner Schnitzer West LLC

 

PRODUCTS USED

SYSTEM

CATEGORY

Bayer Cell Culture Technology Center is a new construction steel moment frame building designed to obtain an “Immediate Occupancy” performance classification.  Fluid Viscous Dampers within the moment frames helped to achieve this enhanced building performance. Adding dampers also helped significantly reduce foundation sizes by reducing moment frame overturning demands.

 

Investor Information

2022 Q1 Important Links

 

Investor Information

2021 Q4 Important Links

Investor Information

2021 Q3 Important Links

Investor Information

2021 Q2 Important Links

Investor Information

2021 Q1 Important Links

Investor Information

2020 Q4 Important Links

Investor Information

2020 Q3 Important Links

Thank You!

A Taylor Devices Representative will be in touch shortly.

Investor Information

2020 Q1 Important Links

Investor Information

2019 Q4 Important Links